Vacuum dewatering system scope in concrete floor plan
« on: March 31, 2011, 12:53:45 PM »
Constech India is a keen observer about concrete floor plan and use of vacuum dewatering system in it. For laying high quality concrete floors with superior cost-effectiveness. The key to the use of this method is the dewatering of concrete by vacuum process. Surplus water from the concrete is removed immediately after placing and

vibration, reducing the water : cement ratio to an optimum level. Therefore, adopting the TREMIX method facilitates use of concrete with better workability than what is normally possible. A lowered water : cement ratio automatically leads to a noticeable improvement in almost each of the concrete properties.

THE OPERATION
In order to obtain a high quality concrete floor using this method, it is essential to follow the various operations in the correct
sequence. Initially, poker vibration is essential, especially at the panel edges. This results in proper compaction of the
concrete and hence elimination of voids and entrapped air. Poker vibration never really gives a leveled surface. It is therefore essential to combine this vibration with surface vibration (screeding), in order to obtain a vibrated concrete with a leveled surface.

Two passes with surface vibrator are normally recommended. The Surface Vibrator is guided by two men, standing on either side of the panel. Vacuum dewatering process removes surplus water always present in the concrete. This is done using the Vacuum Equipment comprising of Suction Mat Top Cover, Filter pads and Vacuum Pump. The process starts immediately after surface vibration.
2.
Filter pads are placed on the fresh concrete leaving about 4 inches of fresh concrete exposed on all sides. The Top Cover is then placed on the filter pads and rolled out till it covers the strips of exposed concrete on all sides. The Top Cover is
then connected to the vacuum pump through a suction hose and the pump is started. Vacuum is immediately created between the filter pads and the top cover. Atmospheric pressure compresses the concrete and the surplus water is
squeezed out. This process lowers the water content in the concrete by 15-25%. The dewatering operation takes approx.

1.5 - 2 minutes per centimeter thickness of the floor. The dewatered concrete is compacted and dried to such an extent
that it is possible to walk on it without leaving any foot prints. This is the indication of concrete being properly dewatered and ready for finishing.
The finishing operations -
Floating & Troweling take place right after dewatering. Floating operation is done with Floating disc. This ensures after mixing of sand & cement particles, further compaction and closing the pores on the surface. Floating operation generates skid-free finish. Troweling is done with Troweling blades in order to further improve the wear
resistance, minimize dusting and obtain smoother finish.

 

The Indian Architecture & Construction Network Blog is an unmoderated blog for the Indian architects, indian Architecture and indian construction industry. The issues discussed here / news relate to professional practice, construction, design, environment, urban design, interiors, green buildings, sustainability, Energy Efficient Architecture, architectural competitions, academic standards, projects, professional institutions, architecture students, CAD, vaastu, Job postings etc. etc. The comments posted on this blog are the views of the poster. The Blog owners may or may not subscribe to the same and cannot be held responsible for the same. The blog owners take no responsibilty for any loss incured by anyone whatsoever it maybe, by clicking on the links on this website.

Indian Architecture & Construction Blog

The blog is hosted by Manchanda Associates . www.manchanda.co.in

ENVARCH - an Environmental design initiative by Manchanda Associates
Industrial Design : Retractable Vehicle shade for tropical & Cold climates